…my favourite day of the month, when DESNZ flood us with stats on all sorts of bits and bobs, including SHDF/WHSHF and WHLG. So let’s hop straight in and update you on how all schemes are 100% on time and 100% on budget. SHDF Wave 2.1 and 2.2 Firstly, I should point out a DESNZ disclaimer, that there is often a lag in reporting and therefore, even though the data should include installations up to the end of January 2026, the likelihood is that there will be a lot of bac